• Mapna Group was established as a general contractor in August ۱۹۹۳ following implementation of Shahid Rajaee Power Plant Project and based on the enactment of Economy Council on March ۱۳, ۱۹۹۲.

• Current status of Mapna Group: First and largest general contractor in the Middle East and west Asia in the field of power plants/ first and largest manufacturer of main power plant equipments in Iran/ first and largest Iranian investor in the private sector's power plant plans in the country/ general contractor of upstream and midstream oil and gas projects/ locomotive manufacturer and contractor of implementing different railway projects in the country
• Holding record of 36 days for the complete overhaul repair of a gas turbine in south Isfahan's power plant
• Being among the ten top manufacturers of power plant equipments in the world based on the evaluation conducted by Gas Turbine World Magazine
• Has constructed or under-construction thermal power projects in Raysut and Qarn-Alam (Oman), Al-Sadr town and Najaf (Iraq), Tishreen and Jandar (Syria) and Belawan (Indonesia)
• Participating in the international tenders in Syria, Iraq, Lebanon, Algeria, Malaysia, Oman and and Indonesia
• Having 20 technology transfer contracts with internationally renowned companies from Germany, Switzerland, South Korea, Italy, England, the Netherlands, Ukraine, France, Russia and China for transferring technical knowledge of design, engineering and manufacturing of equipments and managing the energy and railway projects
• Number of personnel ( direct employment): over ۱۲,۰۰۰
Some products and services offered by Mapna Group in energy sector:
• V۹۴.۲ gas turbine with ۱۵۹ MW capacity / MAP۲+ upgraded gas turbine / E-Type steam turbine with ۱۶۰ MW capacity / ۲۵ MW industrial turbine / centrifugal gas compressor
• Manufacturing Ansaldo-design 160 MW thermoelectric gas generator / Ansaldo-design 160 MW combined cycle thermoelectric generator / Siemens-design 162 MW combined cycle thermoelectric generator / 173 MW upgraded thermoelectric gas generator (ISO standard) / Jeumont-design 25 MW industrial generator / different hydroelectric generators with the capacity of up to 250 MW for power plants / designing and manufacturing different types of bus duct for thermal power plants and wind farms
• Manufacturing parts of locomotive and bogie and different heavy equipments of gas and steam turbines as well as oil and gas turbo compressors
• V94.2, Version 5, MAP2+ turbine blades / boiler of gas turbine torches / GE-F9 turbine blades / blades and hot section parts with TBC coating / GE-F5 turbine blades - Blade1(DS) / LPT Vane steam turbine blade / blade and hot section parts of small turbines in oil and gas industry / blades of GE gas turbine model Frame 5 / rebuilding blades and hot section parts of different types of turbine
• I&C systems of gas and steam turbines / engineering systems and equipments of the Central Control Room (CCR) of power plant / Combined Cycle Power Plant Distributed Control Systems (CCPP DCS) / SEE and SFC systems of generator / EHW systems of generator / bus duct systems of different types of generator / I&C systems of power plants in oil, gas, petrochemical and other industries
• Heat recovery boilers / thermal power plant boiler / water tube boilers
• Implementing projects of gas, steam and combined cycle power plants, cogeneration of heat and power, desalination plants (cogeneration of power and fresh water), renewable energies / investment in power plant plans / designing and engineering / operation and maintenance of power plants / rehabilitation and upgrading of power plants

Activities in oil and gas industries
• Developing oil and gas fields (onshore and offshore)
• EDP projects (onshore and offshore)
• Midstream and downstream process units
• Utility and offside units
• Pipelines and pressure stations
• Under pressure tanks

Activities in railway industry
• Manufacturing passenger and cargo electro-diesel locomotives
• Manufacturing auxiliary equipments of locomotive such as door, brake and air conditioning system
• Manufacturing shunting locomotive
• Implementing railway projects such as subway and monorail projects

Mapna's power plant projects in Iraq
Given the objectives of Mapna Group in developing exports of engineering services, building power plants outside the country and investment making in this field, and also its strategy for promoting the competitive status of group for participation in domestic and foreign tenders, it implemented Al-Sadr Project in the form of EP and Heydariyeh (Najaf) Project in the form of EPC in Iraq with the following specifications:

Al-Sadr Project (EP)
Supplying ۲ units of ۱۶۲ MW gas turbo-generator and their auxiliary equipment, instrumentation, spare parts, supervision over installing and commissioning, instructing and offering after sales services
Date: June 19, 2008
Duration of contract: ۳۶ months including guarantee period of ۱۲ months
Client: Sanir-Ameran Ofogh joint venture
Contractors: Mapna- Mapna International F.Z.E- Mapna MD۱
Date of Mapna Group's joint venture: November 6, 2008
Location of site: Northeast of Baghdad, Iraq
Fuel system: Gas as the main and gas oil as the replaced fuel (four 15-million liter tanks)
Executive status of units:
Synchronization date of first unit: April 14, 2011
Synchronization date of second unit: June ۱۹, ۲۰۱۱
PAC date of first unit: April 24, 2011
PAC date of second unit: June ۲۸, ۲۰۱۱

Heydariyeh (Najaf) Project
Project of Heydariyeh (Najaf) which includes engineering task, supplying equipments, installing and launching a gas power plant with the average capacity of 162 MW in the form of EPC is now underway. July 16, 2002 is the start date of contract. Synchronization date of first unit will be after 12 months, PAC date will be 2 months after that and FAC date will be 12 months after PAC.
Location of site: Next to Najaf refinery, kilometer ۲۵th of Najaf-Karbala road, Iraq
Substation and transmission line specifications: 132 KV (to be conducted by main contractor)
Turbine specifications: V۹۴.۲ MAP۲+
Diesel generator: Two 500KVA container diesel generators
Employer: Reconstruction Organization of Holy Shrines in Iraq
Contractor: Mapna MD2
Date of starting project: July ۱۶, ۲۰۱۲
Anticipated date of synchronization: April 24, 2014

Oil and gas
Despite a short track oil and gas industry, it has had fast growth and progress. In addition to enjoying valuable experiences in the field of power generation industry this group is one of the active domestic companies in developing oil and gas fields and have onshore drilling equipments and is moving toward offshore drilling activities. In this due, Mapna has projects underway in the phases of South Pars Gas Field and the project of developing "Forouz B" Gas Field. This project in the south part of Kish Island, which will be conducted based on a buyback contract, is the first Gas to Wire (GTW) project in the country and includes onsite power generation by produced gas. Generated electricity is then transmitted inside and outside the country. This project can promote the country's strategic status noticeably in the region in the field of energy generation and transmission.
Of the main oil and gas subsidiaries of Mapna Group, it could be referred to Middle East Energy Development Company, Neyr Perse Company, Mapna Oil and Gas Development Company, and Tehran Energy Consultants (TEC). The activity of oil and gas division of Mapna Group is focused on developing oil and gas fields (onshore and offshore), conducting more onshore and offshore drilling task, promoting technology and transferring technical knowledge of manufacturing the main equipments of oil and gas industry, having stronger presence in upstream engineering and studying projects and producing value added through economically viable investment making in the oil and gas projects.